
New condo buyers in Ontario get a 10-day cooling-off period after signing or receiving the disclosure statement. Ask for the full deposit schedule, any development-charge caps and the Tarion warranty details before you commit. Your agent can review the agreement with you.
Ask Zara about this projectThe most anticipated preconstruction project in Kanata
Westwood is a new townhouse and single family home community by Richcraft Homes currently under construction at Robert Grant Avenue, Ottawa. Available units range in price from $701,503 to over $1,142,900. Westwood unit sizes range from 1170 to 2820 square feet.
Welcome to Westwood
Work, play and shop close to home in Westwood, a community that has everything in Ottawa's West end including the Canadian Tire Centre and the Bell Sensplex. On the edge of Stittsville, Westwood plans to weave together green space, walkways and a community to connect people, nature, and places.
Features and finishes SINGLES 2022 SPECIFICATIONS
STRUCTURE - R-60 blown insulation in attic (R-40 in cathedral) - R-32 closed cell spray foam insulation in garage ceiling under second floor areas - R-27 insulation in exterior house wall complete with high performance exterior structural sheathing - R-22 total basement insulation (R-10 continuous foam to minimize thermal bridging with an R-12 batt) with drywall and electrical plugs on the exterior perimeter walls - R-10 rigid insulation under basement slab, comes with radon seal - Spray foam injection around the windows, exterior doors and at basement headers - Quality air barrier house wrap - Impermeable membrane/air gap system on exterior foundation walls - Insulated exterior structural sheathing on kiln dried 2" x 6" studs at 16" centers on external walls and 2" x 6" studs and 2" x 4" studs on internal walls - 2" x 4" basement studs framed full height at 24" centers (external walls only) - Structural high performance 3/4" T&G OSB subfloor, nailed, sanded, screwed and glued - Fully drywalled garage with one coat finish - Poured 8" concrete foundation walls with steel reinforcement on 20" concrete footings - Poured 4" reinforced concrete garage floor with broom finish - Poured 3" thick concrete basement floor with troweled finish - Steel basement beams supported on steel posts - Prefabricated engineered roof trusses at 24" centres - Roof sheathing: 7/16" OSB sheathing with "H" clips - 6 mil polyethylene vapour barrier - 4" diameter perimeter drainage system with clear stone coverage - Cement parging to exposed foundation walls (externally)
Builders change incentives often. Register and we'll send what's on offer today.