Selling nowTownhome7photosDistrikt Trailside West Condos by Distrikt Developments
Distrikt Trailside Community | 407 Dundas Street West, Oakville, Ontario
From$824,900
- Occupancy
- Est. Compl. Summer 2023
- Deposit
- 40%
- Suites
- 1-2
- Builder
- Distrikt Developments
- Type
- Condos
- Units
- 319
- Suites
- 1-2
- Price from
- $824,900
- Deposit
- 40% in 8 payments
- Occupancy
- Est. Compl. Summer 2023
- Status
- Selling Now
- Last updated
01 Overview
About Distrikt Trailside West Condos
Distrikt Trailside West Condos is a pre-construction condos development by Distrikt Developments at Distrikt Trailside Community | 407 Dundas Street West, Oakville with 319 suites. Prices start from $824,900, with occupancy estimated for Est. Compl. Summer 2023. Current status: selling now (updated September 2026).
The most anticipated preconstruction project in Oakville.
Distrikt Trailside West is a new condo and townhouse development by Distrikt Developments currently under construction at 407 Dundas Street West, Oakville. The development is scheduled for completion in 2023. Available units range in price from $824,900 to $1,099,900. Distrikt Trailside West has a total of 319 units. Sizes range from 701 to 1055 square feet.
Read the full descriptionShow less
Distrikt Trailside takes Oakville's beauty and premier livability a step further. This master-planned community of luxury condominiums and townhomes is nestled amid verdant parks and untouched ravines, offering lush surroundings and superior connectivity at your doorstep.
Experience a lifestyle imbued with fine dining, world-class shopping, beautiful shoreline and some of the best public and private schools in the area.
BUILDING FEATURES
Distrikt Trailside West is part of a masterplanned community. The West phase includes a ten storey building with two blocks of single and two storey executive suites designed by Kirkor Architects.
• Spectacular indoor amenity and suite features by award-winning interior design firm figure3 • Outdoor amenity spaces and rooftop designed by landscape architect Adesso Design • The lobby includes a 24 hour concierge, double-height ceilings, and two feature fireplaces • Located just off the lobby is the property management office and a convenient parcel storage system and mail room • The ground floor amenity space includes a pet washing station and a double height fitness studio equipped with state of the art weights and universal cardio equipment, as well as ample indoor and outdoor spaces to do yoga and Pilates • On the 6th floor there is an extensive residents' amenity space featuring a chef kitchen, private dining room, a separate lounge with fireplace, and a games room. The fireside lounge and bar extends to a beautiful outdoor terrace featuring two barbecues and both a trellised dining area and several lounge spaces, surrounded by expansive views of Oakville, Glade side Pond and the nearby lush greenery • Ample underground parking for all residents and surface parking for visitors • Extensive bicycle parking for residents, located on the main floor
INNOVATIVE FEATURES • LED lighting throughout the building. Energy efficient, long lasting and low maintenance • Exclusive selection of low volatile organic compound (VOC) paints, sealants, and adhesives, including carpet and underlay (as applicable) • High-performance mechanical systems to ensure the building performs efficiently while providing optimal comfort in all conditions • CO2 controlled ventilation in amenity spaces to ensure efficient and comfortable control of air quality in amenity spaces • Electric Vehicle (EV) charging infrastructure in parking garage where applicable • CO controlled ventilation in the parking garage to ensure efficient and safe control of air quality within the garage • Building Automation System (BAS) to monitor, control, and ensure efficient and comfortable operation of common area HVAC, lighting and safety systems • Wi-fi available in all amenity spaces including parking garage
COMFORT, SAFETY AND SECURITY • Distrikt AI Smart Community System available in-suite and through mobile application includes: - One (1) Digital touch-screen wall pad insuite for residents to interact with home and community - Executive suites to include One (1) suite entry door camera - Midrise building main entrance intercom system that is integrated to wall pad and mobile app - Digital door lock for front entrance of all units - Integrated suite security including door contacts and motion sensor for terrace/ ground floor suites - Community security management with ability to view all buildings' cctv cameras - Email notifications and phone alerts - Remote visitor management - Remote thermostat control and HVAC integration - Community messaging and notification system (by property management) - Integrated unit and building alarm notification includes integration with smoke detector - Building parking management ready - Suite water floor detection ready - Parcel integration ready - Building wired with fibre optics and ready for future technologies • Each suite to have individually controlled heating and cooling system that provides year round heat and air conditioning • Sub metering of hydro and water as per applicable plan in Midrise building. Executive suites have also sub metering of gas • Security cameras in main entrance and key areas around property • Smoke, heat and carbon monoxide detector(s), as per applicable plan • Fire detection, protection and sprinkler systems, as per applicable plan
KITCHEN FEATURES • Luxury kitchen by Trevisano, made in Italy • Choice of quartz stone countertops from builder's selections • Choice of luxurious combination of glass and European laminate cabinetry materials including a convenient bank of drawers • Soft close drawers and cabinets • Choice of exotic porcelain backsplash tile from builder's standard selections • Single basin under mount stainless steel sink with single lever faucet and convenient pulldown spray • Quality appliances include: - Stainless steel ENERGY STAR® refrigerator - Stainless steel electric smooth top freestanding range - Stainless steel hood fan - Panel ready ENERGY STAR® dishwasher - Stainless steel microwave located in kitchen cabinetry
IN-SUITE FEATURES • 10' ceiling heights on the penthouse levels and approximately 9' ceiling heights on all floors below, except as required for mechanical and electrical or special architectural features • 10-1/2' ceiling heights in Executive suites, except as required for mechanical and electrical or special architectural features • Smooth ceiling finish throughout • Choice of laminate flooring throughout, except in tiled areas, as per applicable plan, from builder's standard selections • 2-storey suites to receive oak stairs, oak veneer stringer and nosing with metal handrail • Approximate 4" baseboards with approximate 2" casing on all interior swing doors throughout • Slab Style (Flat) smooth interior painted swing doors, as per applicable plan. One style throughout • White flat panel sliding closet doors in bedrooms and in the foyer, as per applicable plan • Lever on all interior swing doors. Privacy locks on all doors and master bedroom door
LAUNDRY FEATURES • Laundry areas receive 12" ceramic tile flooring, as per applicable plan • Stacked energy and water saving front loading white dryer and ENERGY STAR® washer vented to exterior
OUTDOOR FEATURES • One (1) Natural gas bib on all executive suite patios and terraces, LPH and PH balconies or terraces, as well as certain terraces on level 5 (as per plan) and ground level patios in the midrise building • Privacy screening for ground floor patios (as per applicable plan where permitted by approval authority)
ELECTRICAL AND COMMUNICATIONS • Cell phone signal amplifier for quality cell phone reception throughout the building • Telephone, cable and high speed Internet access via fibre optic distribution in suites • Surface mounted ceiling lights provided in foyer, bedrooms, living, hallways and den; track light with 3 heads provided in the kitchen and capped ceiling box over dining and kitchen island as per applicable plan • Designer selected wall mount light fixture installed above each sink in all bathrooms • Exterior duplex weatherproof receptacle on balconies, terraces and patios • One (1) USB port • Decora switches and plugs
MASTER ENSUITE OR MAIN BATHROOM & SECOND BATHROOMS • Vanity cabinet by Trevisano, made in Italy • Choice of 12" x 24" tile flooring from builder's standard selections • Choice of quartz stone countertops from builder's standard selections • Soft close drawers and cabinets • Mirror above vanity • Chrome or Gold colour bathroom accessories to include towel bar and toilet tissue dispenser • Acrylic soaker tub and/ or stand up shower with ceramic wall tiles to ceiling height as per builders standard selections • Water saving single lever faucets and shower heads and pressure balanced temperature controlled shower valves included • Premium high-performance plumbing fixtures and premium single flush toilets throughout to save water and money • Bathroom vented to exterior with fan and timer
Source: Distrikt Trailside
Builder's Website:
02 Pricing
Distrikt Trailside West Condos prices & price list
| Starting price | $824,900 |
|---|---|
| Up to | $1,099,900 |
Full price list
Every available suite, price and floor.
- Prices by floor and exposure
- Parking, locker & fees
- Current incentives
Sent by a licensed advisor. Prices change between releases, so ask for the latest.
03 Deposit structure
Distrikt Trailside West Condos deposit structure
Total deposit before occupancy
40%
- 10% · Only Down Until Occupancy &bull
- 5% · Balance to due in 30 days &bull
- 2.5% · Due in 90 days &bull
- 2.5% · Due in 180 days &bull
- 5% · Due on Occupancy 3BR and TH Suites &ndash
- 5% · Only Down Until Occupancy &bull
- 5% · Balance to due in 30 days &bull
- 5% · Due on Occupancy
| Payment | When | % | On $824,900 |
|---|---|---|---|
| Deposit 1 | Only Down Until Occupancy &bull | 10% | $82,490 |
| Deposit 2 | Balance to due in 30 days &bull | 5% | $41,245 |
| Deposit 3 | Due in 90 days &bull | 2.5% | $20,623 |
| Deposit 4 | Due in 180 days &bull | 2.5% | $20,623 |
| Deposit 5 | Due on Occupancy 3BR and TH Suites &ndash | 5% | $41,245 |
| Deposit 6 | Only Down Until Occupancy &bull | 5% | $41,245 |
| Deposit 7 | Balance to due in 30 days &bull | 5% | $41,245 |
| Deposit 8 | Due on Occupancy | 5% | $41,245 |
| Total | 40% | $329,960 | |
For illustration: the builder's published deposit structure, applied to the starting price. Your agreement of purchase and sale sets the exact amounts and dates. How deposits work
04 Floor plans
Distrikt Trailside West Condos floor plans
Available1 Bed + Den
1+den · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available1 Bed + Den
1+den · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
Available2 Bed
2 bed · bath
Price on request
05 Amenities
Distrikt Trailside West Condos amenities
- Residence Lounge
- Mail Room
- Concierge
- Grand Lobby
- Pet Spa
- Dining Area
- Prep Kitchen
- BBQ Area
- Bar
- Fitness Studio
- Outdoor Terrace Lounge
- Parcel Room
- Moving Room
- Party Lounge
06 Location & transit
Distrikt Trailside West Condos location & transit
Address
Distrikt Trailside Community | 407 Dundas Street West
Oakville, Ontario
07 Key dates
Distrikt Trailside West Condos key dates
September 30, 2026
Details last updated
Est. Compl. Summer 2023
Estimated occupancy
08 Monthly cost
Estimate your Distrikt Trailside West Condos mortgage payment
Estimated monthly
$3,665
Principal and interest only. Excludes maintenance fees, property tax and insurance.
09 The builder
About Distrikt Developments
Distrikt Developments is the developer behind Distrikt Trailside West Condos.
More from Distrikt Developments
10 Assignments
Distrikt Trailside West Condos assignments
No Distrikt Trailside West Condos assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales
Own a unit here?
List your assignment free. We check the builder's consent terms and keep your details private.
11 About the agent
Listed with Summitly
Coldwell Banker Summit Realty, Brokerage
Broker of Record: Waqar Afzal · Pre-Construction Specialist
An independently owned and operated Coldwell Banker franchise, registered with the Real Estate Council of Ontario (RECO). We specialize exclusively in pre-construction condos, townhomes and new homes — giving buyers VIP access to floor plans and pricing, 1% cash-back on closing, and unbiased project comparisons, at no cost to buyers.
- ✓ Pre-construction only
- ✓ No buyer-side fees
- ✓ VIP floor plans & pricing
- ✓ 1% cash-back on closing
- ✓ Greater Toronto Area
- ✓ All Ontario cities
Compare
Similar projects in Oakville
Selling nowTownhome7photos
Selling nowDetached & semi4photos
Selling nowCondo
Before you buy
The rules that protect pre-construction buyers in Ontario, in plain language.
- 01How pre-construction deposits workTypical schedules, where the money is held and Tarion deposit protection.
- 02HST rebates on new homesWho qualifies, how the rebate is assigned to the builder and what investors owe.
- 03The 10-day condo cooling-off periodYour right to cancel a new condo purchase, and when the clock starts.
- 04Tarion new-home warrantyThe 1-, 2- and 7-year coverage and delayed-closing compensation.
- 05Closing costs on a new buildDevelopment charges, levies, land transfer tax and adjustments to budget for.
Questions
Distrikt Trailside West Condos FAQs
Quick answers about Distrikt Trailside West Condos. Have another question?
Where is Distrikt Trailside West Condos located?
In Oakville, Ontario. Distrikt Trailside West Condos is a new pre-construction condos development there.
What kind of homes does Distrikt Trailside West Condos offer?
Condos — 319 suites. Distrikt Trailside West Condos is a condos development in Oakville, Ontario; the full suite and floor-plan collection is available on request.
How much does Distrikt Trailside West Condos cost?
From $824,900. That is the lowest suite price on the latest Distrikt Trailside West Condos price list we hold; builders change prices between releases, so request the current price list before you decide.
What suite sizes are available at Distrikt Trailside West Condos?
1-2 suites. Floor plans with exact sizes and prices for each suite at Distrikt Trailside West Condos are available on request.
When is occupancy for Distrikt Trailside West Condos?
Estimated for 2023. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.
Is Distrikt Trailside West Condos a good investment?
It depends on your budget, timeline and the Oakville, Ontario market. Buying pre-construction at Distrikt Trailside West Condos fixes today's price with a staged deposit, with occupancy expected in 2023; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.
How do I get floor plans and prices for Distrikt Trailside West Condos?
Request them on this page. Our team emails Distrikt Trailside West Condos's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.
More pre-construction questionsFewer questions
What is a pre-construction project?
A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.
How do deposits work for pre-construction?
Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.
What happens if the project is delayed?
Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.
What are the risks of buying pre-construction?
Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.
When do I start making mortgage payments?
Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.
Can I customize my unit?
Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.
What warranties are included with pre-construction homes?
New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.
What happens if the developer goes bankrupt?
If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.
What documents do I need to review before purchasing?
Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.
How long does it take from purchase to move-in?
Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.
Can I visit the construction site?
Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.
What happens at the final inspection and closing?
Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.
Get the Distrikt Trailside West Condos price list before you decide.
Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.
Coldwell Banker Summit Realty, BrokerageLast updated
Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.
Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.
From
$824,900



