Skip to main content
Selling nowCondos

Douglas Green Living Condos by Panorama West Group

185 175A Street, Surrey, British Columbia

From$869,900

Occupancy
Est. Compl. Apr 2024
Suites
1-3
Artist's concept
Type
Condos
Units
64
Suites
1-3
Price from
$869,900
Deposit
Current Incentives $10,000 as cash incentive (…
Occupancy
Est. Compl. Apr 2024
Status
Selling Now
Last updated

01 Overview

About Douglas Green Living Condos

Douglas Green Living Condos is a pre-construction condos development by Panorama West Group at 185 175A Street, Surrey with 64 suites. Prices start from $869,900, with occupancy estimated for Est. Compl. Apr 2024. Current status: selling now (updated October 2026).

The most anticipated preconstruction project in Surrey

Douglas Green Living (Condos) is a new condo and townhouse development By Panorama West Group currently in preconstruction at 185 175A Street, Surrey. The development is scheduled for completion in 2024. Available units range in price from $869,900 to $869,900. Douglas Green Living (Condos) has a total of 64 units. Sizes start at 1099 square feet.

Read the full description

EXPERIENCE DOUGLAS GREEN LIVING

CONTEMPORARY STYLE, SUSTAINABLE DESIGN

A community that inspires wellness – of self, community, and planet. Wake up feeling refreshed and rested. These beautiful new condos and townhomes for sale makes Douglas Green Living a great place to call home.

CREATIVITY Designed to enhance your energy levels, and overall well-being. Douglas Green Living, offering contemporary new condos, townhomes and commercial with stylish and sustainable plans.

SUSTAINABILITY This green community features parks and open spaces, with energy efficient technologies – like vehicle charging stations – encouraging a low carbon lifestyle. Easy access to public transit, puts the shops, restaurants and business well within reach.

COMFORT These beautiful new condos and townhomes for sale makes Douglas Green Living a great place to call home. community that inspires wellness – of self, community, and planet. Wake up feeling refreshed and rested.

DOUGLAS GREEN LIVING Features five-storey condos, townhomes and commercial units that are contemporary in style and sustainable in design. A wide range of floor plans with one to three bedrooms, open concept making a stunning use of space with modern kitchens, sleek baths, balconies on select floor plans with open-air entertaining.

Features & Finishes 2 Decorative Colour Schemes: Classic (dark) and Contemporary (light) Modern, decorative light fixtures Oversized double glazed windows Designer tile flooring in all bathrooms Elegant faucets High-capacity CAT-5 wiring with telephone/cable/data outlets throughout Pre-wired for cable, internet and phone line on each floor Full size in-suite laundry

KITCHEN Quartz countertops with under-mount double bowl stainless steel sink and removable nozzle spray Contemporary single lever faucet Elegant tile backsplash Sleek cabinets with soft-touch close technology Full size stainless steel appliances: refrigerator, stove, dish washer, hood fan and microwave Garburator

BATHROOM Large mirror with light bar Under-mount porcelain sink with modern single lever faucet Master with full stand up shower (townhomes only) and full height ceramic tiles Modern bathroom accessories

WARRANTY 2-5-10 year

Source: Douglas Green Living

Builders website:

02 Pricing

Douglas Green Living Condos prices & price list

Douglas Green Living Condos pricing
Starting price$869,900
Up to$1,149,000

Full price list

Every available suite, price and floor.

  • Prices by floor and exposure
  • Parking, locker & fees
  • Current incentives

Sent by a licensed advisor. Prices change between releases, so ask for the latest.

03 Deposit structure

Douglas Green Living Condos deposit structure

Current Incentives $10,000 as cash incentive (Q4-2022)

As published by the builder. Your agreement of purchase and sale sets the exact schedule.

04 Floor plans

Douglas Green Living Condos floor plans

6 plans from the latest release. Prices and availability move quickly, so request any plan to get its current price.
  • 203 floor planAvailable

    203

    1 bed · 1 bath

    $519,900
  • 502 floor planAvailable

    502

    2 bed · 2 bath

    $769,900
  • 205 floor planAvailable

    205

    3 bed · 2 bath

    $789,900
  • 102 floor planAvailable

    102

    2 bed · 2 bath

    $869,900
  • 103 floor planAvailable

    103

    2 bed · 2 bath

    $879,900
  • 105 floor planAvailable

    105

    3 bed · 2 bath

    Price on request

05 Amenities

Douglas Green Living Condos amenities

  • Easy access to major highway
  • Near Parks,
  • Schools,
  • Restaurants
  • Shopping and many more

06 Location & transit

Douglas Green Living Condos location & transit

Address

185 175A Street

Surrey, British Columbia

07 Key dates

Douglas Green Living Condos key dates

  1. October 2, 2026

    Details last updated

  2. Est. Compl. Apr 2024

    Estimated occupancy

08 Monthly cost

Estimate your Douglas Green Living Condos mortgage payment

$870,000
20% · $174,000
4.49%
25 years

Estimated monthly

$3,865

Principal and interest only. Excludes maintenance fees, property tax and insurance.

09 The builder

About Panorama West Group

Panorama West Group is the developer behind Douglas Green Living Condos.

All Panorama West Group projects

10 Assignments

Douglas Green Living Condos assignments

No Douglas Green Living Condos assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales

Own a unit here?

List your assignment free. We check the builder's consent terms and keep your details private.

List your assignment free

11 About the agent

Listed with Summitly

Coldwell Banker Summit Realty, Brokerage

Broker of Record: Waqar Afzal · Pre-Construction Specialist

An independently owned and operated Coldwell Banker franchise, registered with the Real Estate Council of Ontario (RECO). We specialize exclusively in pre-construction condos, townhomes and new homes — giving buyers VIP access to floor plans and pricing, 1% cash-back on closing, and unbiased project comparisons, at no cost to buyers.

  • ✓ Pre-construction only
  • ✓ No buyer-side fees
  • ✓ VIP floor plans & pricing
  • ✓ 1% cash-back on closing
  • ✓ Greater Toronto Area
  • ✓ All Ontario cities

Questions

Douglas Green Living Condos FAQs

Quick answers about Douglas Green Living Condos. Have another question?

Where is Douglas Green Living Condos located?

In Surrey, British Columbia. Douglas Green Living Condos is a new pre-construction condos development there.

What kind of homes does Douglas Green Living Condos offer?

Condos — 64 suites. Douglas Green Living Condos is a condos development in Surrey, British Columbia; the full suite and floor-plan collection is available on request.

How much does Douglas Green Living Condos cost?

From $869,900. That is the lowest suite price on the latest Douglas Green Living Condos price list we hold; builders change prices between releases, so request the current price list before you decide.

What suite sizes are available at Douglas Green Living Condos?

1-3 suites. Floor plans with exact sizes and prices for each suite at Douglas Green Living Condos are available on request.

When is occupancy for Douglas Green Living Condos?

Estimated for 2024. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.

Is Douglas Green Living Condos a good investment?

It depends on your budget, timeline and the Surrey, British Columbia market. Buying pre-construction at Douglas Green Living Condos fixes today's price with a staged deposit, with occupancy expected in 2024; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.

How do I get floor plans and prices for Douglas Green Living Condos?

Request them on this page. Our team emails Douglas Green Living Condos's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.

More pre-construction questions
What is a pre-construction project?

A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.

How do deposits work for pre-construction?

Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.

What happens if the project is delayed?

Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.

What are the risks of buying pre-construction?

Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.

When do I start making mortgage payments?

Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.

Can I customize my unit?

Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.

What warranties are included with pre-construction homes?

New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.

What happens if the developer goes bankrupt?

If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.

What documents do I need to review before purchasing?

Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.

How long does it take from purchase to move-in?

Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.

Can I visit the construction site?

Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.

What happens at the final inspection and closing?

Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.

Get the Douglas Green Living Condos price list before you decide.

Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.

Coldwell Banker Summit Realty, BrokerageLast updated

Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.

Summitly (Coldwell Banker Summit Realty, Brokerage) is licensed in Ontario. For this British Columbia project we share published research and can put you on the builder's registration list; a brokerage licensed in British Columbia handles any purchase.

Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.

From

$869,900

Call