Bass 4 Griffintown Sur Le Canal by Musto Construction
Rue des Bassins & Rue du Séminaire, Montréal, Quebec
From$259,000
- Occupancy
- Completed in 2023
- Builder
- Musto Construction
- Type
- Condos
- Units
- 275
- Price from
- $259,000
- Occupancy
- Completed in 2023
- Status
- Coming Soon
- Last updated
01 Overview
About Bass 4 Griffintown Sur Le Canal
Bass 4 Griffintown Sur Le Canal is a pre-construction condos development by Musto Construction at Rue des Bassins & Rue du Séminaire, Montréal with 275 suites. Prices start from $259,000, with occupancy estimated for Completed in 2023. Current status: coming soon (updated October 2026).
The most anticipated preconstruction project in Montreal.
Bass 4 Griffintown Sur Le Canal is a new pre-construction condo development by Musto Construction. Coming soon to Rue des Bassins & Rue du Séminaire in Montreal, Quebec.
Read the full descriptionShow less
The largest rooftop patios in Griffintown are found at Bass Condos. The all-concrete building has cabanas, a leisure area with BBQs and outdoor dining places, a 40-foot long over-sized swimming pool, a gym, and also an urban chalet. All of which are available to condo owners to create an environment that will especially appeal to the most discerning.
Each apartment is meticulously created with the utmost attention to detail. Designer kitchens featuring huge kitchen islands, master suites, as well as full-height windows Bass Condos has it everything, including the widest range of materials from which to customize your unit.
10 Reasons to move to Griffintown: Within walking distance of the city centre, its businesses, shops and the Old Port. The neighbourhood is home to mostly young professionals. Griffintown offers its historic look and industrial feel The Lachine Canal and its 13.5-km linear urban park Walk, cycle or kayak away from the hustle and bustle of downtown World cuisine, beer-tasting bars and nightlife Close proximity to Atwater Market Fast-growing market Conveniently located close to public transit (metro, bus, and future REM rapid transit system), plus all major highways. Full of galleries and exhibition spaces
Builder's Website:
02 Pricing
Bass 4 Griffintown Sur Le Canal prices & price list
| Starting price | $259,000 |
|---|---|
| Up to | $889,900 |
Full price list
Every available suite, price and floor.
- Prices by floor and exposure
- Parking, locker & fees
- Current incentives
Sent by a licensed advisor. Prices change between releases, so ask for the latest.
03 Amenities
Bass 4 Griffintown Sur Le Canal amenities
- Urban Chalet
- Outdoor Dining Areas
- Swimming Pool
- Two-Storey Lobby
- Roof Terrace
- BBQs
- Recreation Area
- Gym
- Cabanas
04 Location & transit
Bass 4 Griffintown Sur Le Canal location & transit
Address
Rue des Bassins & Rue du Séminaire
Montréal, Quebec
05 Key dates
Bass 4 Griffintown Sur Le Canal key dates
October 13, 2026
Details last updated
Completed in 2023
Estimated occupancy
06 Monthly cost
Estimate your Bass 4 Griffintown Sur Le Canal mortgage payment
Estimated monthly
$1,155
Principal and interest only. Excludes maintenance fees, property tax and insurance.
07 The builder
About Musto Construction
Musto Construction is the developer behind Bass 4 Griffintown Sur Le Canal.
More from Musto Construction
08 Assignments
Bass 4 Griffintown Sur Le Canal assignments
No Bass 4 Griffintown Sur Le Canal assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales
Own a unit here?
List your assignment free. We check the builder's consent terms and keep your details private.
09 About the agent
Listed with Summitly
Coldwell Banker Summit Realty, Brokerage
Broker of Record: Waqar Afzal · Pre-Construction Specialist
An independently owned and operated Coldwell Banker franchise, registered with the Real Estate Council of Ontario (RECO). We specialize exclusively in pre-construction condos, townhomes and new homes — giving buyers VIP access to floor plans and pricing, 1% cash-back on closing, and unbiased project comparisons, at no cost to buyers.
- ✓ Pre-construction only
- ✓ No buyer-side fees
- ✓ VIP floor plans & pricing
- ✓ 1% cash-back on closing
- ✓ Greater Toronto Area
- ✓ All Ontario cities
VIP access · before the public launch
Register before Bass 4 Griffintown Sur Le Canal opens to the public.
Registration is free. You'll hear from a licensed advisor, not a call centre, and you're never obliged to buy.
First look
Pricing and floor plans as soon as the builder releases them to registrants.
Earlier choice
A chance at layouts, floors and exposures before the public, where the builder offers a VIP allocation.
Launch incentives
Extended deposits or capped levies where the builder offers them.
Compare
Similar projects in Montréal
Selling nowPerspectives Bates Condos
Montréal
From $641,500
Selling nowLaurent & Clark Phase 2 Condos
Montréal
From $898,724
Selling nowThéâtre Snowdon Condominiums
Montréal
From $275,094
Selling nowSax sur le fleuve Condos
Montréal
From $1,035,000
Selling nowMonarc Condominiums
Montréal
From $268,000
Selling nowFlorence Condos
Montréal
From $252,900
Questions
Bass 4 Griffintown Sur Le Canal FAQs
Quick answers about Bass 4 Griffintown Sur Le Canal. Have another question?
Where is Bass 4 Griffintown Sur Le Canal located?
In Montréal, Quebec. Bass 4 Griffintown Sur Le Canal is a new pre-construction condos development there.
What kind of homes does Bass 4 Griffintown Sur Le Canal offer?
Condos — 275 suites. Bass 4 Griffintown Sur Le Canal is a condos development in Montréal, Quebec; the full suite and floor-plan collection is available on request.
How much does Bass 4 Griffintown Sur Le Canal cost?
From $259,000. That is the lowest suite price on the latest Bass 4 Griffintown Sur Le Canal price list we hold; builders change prices between releases, so request the current price list before you decide.
When is occupancy for Bass 4 Griffintown Sur Le Canal?
Estimated for 2023. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.
Is Bass 4 Griffintown Sur Le Canal a good investment?
It depends on your budget, timeline and the Montréal, Quebec market. Buying pre-construction at Bass 4 Griffintown Sur Le Canal fixes today's price with a staged deposit, with occupancy expected in 2023; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.
How do I get floor plans and prices for Bass 4 Griffintown Sur Le Canal?
Request them on this page. Our team emails Bass 4 Griffintown Sur Le Canal's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.
More pre-construction questionsFewer questions
What is a pre-construction project?
A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.
How do deposits work for pre-construction?
Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.
What happens if the project is delayed?
Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.
What are the risks of buying pre-construction?
Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.
When do I start making mortgage payments?
Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.
Can I customize my unit?
Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.
What warranties are included with pre-construction homes?
New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.
What happens if the developer goes bankrupt?
If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.
What documents do I need to review before purchasing?
Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.
How long does it take from purchase to move-in?
Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.
Can I visit the construction site?
Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.
What happens at the final inspection and closing?
Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.
Get the Bass 4 Griffintown Sur Le Canal price list before you decide.
Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.
Coldwell Banker Summit Realty, BrokerageLast updated
Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.
Summitly (Coldwell Banker Summit Realty, Brokerage) is licensed in Ontario. For this Quebec project we share published research and can put you on the builder's registration list; a brokerage licensed in Quebec handles any purchase.
Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.
From
$259,000



