Skip to main content
Selling nowCondos

Legacy on Dunbar Condos by Qualex-Landmark

3596 West 28th Avenue, Vancouver, British Columbia

From$1,699,000

Occupancy
Est. Compl. Summer 2023
Suites
2-3
Artist's concept
Type
Condos
Units
48
Suites
2-3
Price from
$1,699,000
Occupancy
Est. Compl. Summer 2023
Status
Selling Now
Last updated

01 Overview

About Legacy on Dunbar Condos

Legacy on Dunbar Condos is a pre-construction condos development by Qualex-Landmark at 3596 West 28th Avenue, Vancouver with 48 suites. Prices start from $1,699,000, with occupancy estimated for Est. Compl. Summer 2023. Current status: selling now (updated September 2026).

The most anticipated preconstruction project in Vancouver

Legacy on Dunbar is a new condo and townhouse development By Qualex-Landmark currently under construction at 3596 West 28th Avenue, Vancouver. The development is scheduled for completion in 2023. Available units range in price from $1,699,000 to $3,100,000. Legacy on Dunbar has a total of 48 units. Sizes range from 981 to 1248 square feet.

Read the full description

WESTSIDE LIVING AT ITS BEST

48 elegant and spacious homes set amid cherished tree-lined streets of a classic westside neighbourhood. Just minutes from downtown and Vancouver's spectacular beaches, Legacy's beautifully designed two-and three bedroom homes are located at the heart of a community brimming with local shops, cafe and parks. Truly, this is westside living at its best.

Features & Finishes LIVING WELL, LIVING SMART • Featuring a limited collection of 48 spacious two- and three bedroom homes to truly fit any lifestyle • Two designer colour palettes: Collingwood and Highbury • Generous interior living space with beautifully designed floor plans • European glass master wardrobe with internal LED lighting system • Smart thermostat control • Roller shades throughout with black out blinds in bedrooms • Heating and cooling system • Laundry room: side-by-side washer and dryer with counter and/or open shelving or cabinetry* • Engineered oak flooring throughout living areas • Expansive balcony featuring outdoor fireplace and porcelain tile flooring* • Natural gas connection • In-home storage* • 7-foot tall solid core doors

THE OPULENT BATHROOM • Floating vanity with LED under-lighting and halo-lit surrounds • Custom Italian cabinetry • Heated limestone floors • Faucets and shower fixtures handmade in Germany by Dornbracht • Ensuite features a seamless free-standing soaker tub equipped with thermostat-controlled faucet and wand* and/or frameless glass and limestone shower with rain shower head and wall mounted wand • Second bathroom features a bath tub or shower with thermostat-controlled faucet and wand • Private lavatory with a wall-hung toilet (ensuite also includes an automated washlet, shower toilet seat) * • Full slab stone feature wall* • Glass double entry doors to ensuite bathroom*

THE DESIGN FORWARD KITCHEN • World class custom Italian kitchen cabinetry – Motorized upper kitchen cabinet doors – Under-cabinet LED lighting – Elegant in-drawer cutlery organization system – Corner cabinet pull-out storage system • Interior LED lighting sensors in select lower drawers • Polished marble slab over kitchen island with a waterfall edge • Faucets by Dornbracht, handmade in Germany • Sub-Zero & Wolf kitchen appliances - proven performance and timeless design: – 24" Sub-Zero undercounter wine fridge – 36" Sub-Zero premium integrated fridge and freezer – 30" Wolf electric wall oven – 30" Wolf microwave – 36" Wolf gas cooktop with integrated panel controls • 36" integrated range hood fan • 24" Integrated dishwasher by European designer Asko • Built-in pull-out recycling centre • In-sink garbage disposal unit

OFFERING PEACE OF MIND • Secure keyless entry system • Secure out of suite storage • Built-in wall safe • Concierge service • Dedicated Homeowner Care Team • 2-5-10 New Home Warranty

Source: Qualex-Landmark

Builders website:

02 Pricing

Legacy on Dunbar Condos prices & price list

Legacy on Dunbar Condos pricing
Starting price$1,699,000
Up to$3,100,000

Full price list

Every available suite, price and floor.

  • Prices by floor and exposure
  • Parking, locker & fees
  • Current incentives

Sent by a licensed advisor. Prices change between releases, so ask for the latest.

03 Floor plans

Legacy on Dunbar Condos floor plans

11 plans from the latest release. Prices and availability move quickly, so request any plan to get its current price.
  • 304 floor planAvailable

    304

    2+den · 2 bath

    $1,998,000
  • Ph504 floor planAvailable

    Ph504

    3+den · 2 bath

    $3,100,000
  • 306 floor planAvailable

    306

    2+den · 2 bath

    Price on request
  • 2K floor planAvailable

    2K

    2 bed · 2 bath

    Price on request
  • PH3A floor planAvailable

    PH3A

    3+den · 2 bath

    Price on request
  • 2P floor planAvailable

    2P

    2+den · 2 bath

    Price on request

04 Amenities

Legacy on Dunbar Condos amenities

  • Rooftop Garden
  • Concierge Service
  • Indoor fitness facility
  • Private Entrance Lobby
  • Infrared Sauna
  • BBQs
  • Bike Storage
  • Rooftop Lounge
  • Bike Repair Station
  • Underground Parkade

05 Location & transit

Legacy on Dunbar Condos location & transit

Address

3596 West 28th Avenue

Vancouver, British Columbia

06 Key dates

Legacy on Dunbar Condos key dates

  1. September 30, 2026

    Details last updated

  2. Est. Compl. Summer 2023

    Estimated occupancy

07 Monthly cost

Estimate your Legacy on Dunbar Condos mortgage payment

$1,700,000
20% · $340,000
4.49%
25 years

Estimated monthly

$7,552

Principal and interest only. Excludes maintenance fees, property tax and insurance.

08 The builder

About Qualex-Landmark

Qualex-Landmark is the developer behind Legacy on Dunbar Condos.

All Qualex-Landmark projects

09 Assignments

Legacy on Dunbar Condos assignments

No Legacy on Dunbar Condos assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales

Own a unit here?

List your assignment free. We check the builder's consent terms and keep your details private.

List your assignment free

10 About the agent

Listed with Summitly

Coldwell Banker Summit Realty, Brokerage

Broker of Record: Waqar Afzal · Pre-Construction Specialist

An independently owned and operated Coldwell Banker franchise, registered with the Real Estate Council of Ontario (RECO). We specialize exclusively in pre-construction condos, townhomes and new homes — giving buyers VIP access to floor plans and pricing, 1% cash-back on closing, and unbiased project comparisons, at no cost to buyers.

  • ✓ Pre-construction only
  • ✓ No buyer-side fees
  • ✓ VIP floor plans & pricing
  • ✓ 1% cash-back on closing
  • ✓ Greater Toronto Area
  • ✓ All Ontario cities

Questions

Legacy on Dunbar Condos FAQs

Quick answers about Legacy on Dunbar Condos. Have another question?

Where is Legacy on Dunbar Condos located?

In Vancouver, British Columbia. Legacy on Dunbar Condos is a new pre-construction condos development there.

What kind of homes does Legacy on Dunbar Condos offer?

Condos — 48 suites. Legacy on Dunbar Condos is a condos development in Vancouver, British Columbia; the full suite and floor-plan collection is available on request.

How much does Legacy on Dunbar Condos cost?

From $1,699,000. That is the lowest suite price on the latest Legacy on Dunbar Condos price list we hold; builders change prices between releases, so request the current price list before you decide.

What suite sizes are available at Legacy on Dunbar Condos?

2-3 suites. Floor plans with exact sizes and prices for each suite at Legacy on Dunbar Condos are available on request.

When is occupancy for Legacy on Dunbar Condos?

Estimated for 2023. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.

Is Legacy on Dunbar Condos a good investment?

It depends on your budget, timeline and the Vancouver, British Columbia market. Buying pre-construction at Legacy on Dunbar Condos fixes today's price with a staged deposit, with occupancy expected in 2023; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.

How do I get floor plans and prices for Legacy on Dunbar Condos?

Request them on this page. Our team emails Legacy on Dunbar Condos's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.

More pre-construction questions
What is a pre-construction project?

A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.

How do deposits work for pre-construction?

Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.

What happens if the project is delayed?

Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.

What are the risks of buying pre-construction?

Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.

When do I start making mortgage payments?

Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.

Can I customize my unit?

Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.

What warranties are included with pre-construction homes?

New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.

What happens if the developer goes bankrupt?

If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.

What documents do I need to review before purchasing?

Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.

How long does it take from purchase to move-in?

Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.

Can I visit the construction site?

Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.

What happens at the final inspection and closing?

Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.

Get the Legacy on Dunbar Condos price list before you decide.

Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.

Coldwell Banker Summit Realty, BrokerageLast updated

Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.

Summitly (Coldwell Banker Summit Realty, Brokerage) is licensed in Ontario. For this British Columbia project we share published research and can put you on the builder's registration list; a brokerage licensed in British Columbia handles any purchase.

Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.

From

$1,699,000

Call