Launching soonCondo3photosJuniper Gate by The Remington Group
Hartwell Road & 10 Side Road, Georgetown, Halton Hills, Ontario
From$899,990
- Occupancy
- Spring 2026
- Builder
- The Remington Group
- Type
- Houses
- Price from
- $899,990
- Deposit
- $25,000 WITH OFFER •$25,000 IN60 DAYS &bu…
- Occupancy
- Spring 2026
- Status
- Selling Now
- Last updated
01 Overview
About Juniper Gate
Juniper Gate is a houses development by The Remington Group at Hartwell Road & 10 Side Road, Georgetown, Halton Hills. Prices start from $899,990, with occupancy estimated for Spring 2026. Current status: selling now (updated October 2026).
Welcome to Juniper Gate, where the serene ambiance of small-town living intertwines seamlessly with modern luxury. Positioned at the crossroads of Hartwell Road and No. 10 Side Road in Georgetown, Juniper Gate epitomizes countryside elegance with a contemporary twist.
Crafted by The Remington Group, a revered name in Greater Toronto Area development, Juniper Gate sets a new standard for upscale living in Halton Hills, ON. Meticulously designed and impeccably executed, this community offers a diverse selection of bungalows, bungalow lofts, and townhomes, each meticulously curated to elevate your lifestyle.
Read the full descriptionShow less
Select from an array of floor plans and designs, each characterized by expansive ceilings, flowing open-concept layouts, and premium modern amenities and appliances. Whether you prefer the intimacy of a cozy bungalow or the spaciousness of a townhome, Juniper Gate caters to your every need.
Experience a lifestyle centered around wellness, surrounded by lush parks, tranquil trails, and natural beauty, where every day presents new opportunities for outdoor exploration and relaxation. At Juniper Gate, you'll not only find a place to live but also a community where neighbors become friends and cherished memories are made.
Welcome to Juniper Gate – where luxury harmonizes with tranquility, and every aspect is meticulously crafted to inspire.
Juniper Gate Highlights:
- Convenient access to Highway 401 - Only a 9-minute commute to Georgetown GO station - Just an 11-minute drive to SmartCentres Mississauga - Proximity to local parks such as West Branch Park, McNally Street Park, and Cedarvale Park - A short 18-minute drive to Algoma University - Each model boasts soaring ceilings and airy open-concept layouts - Equipped with state-of-the-art contemporary amenities and appliances
Surrounding Living Essentials and Amenities:
Neighborhood : Immerse yourself in the family-friendly ambiance of the surrounding area at Juniper Gate. Amidst verdant greenery, charming parks, and serene trails, these exquisitely designed bungalows and meticulously crafted townhouses offer a haven of wellness-inspired living. Enjoy the convenience of being just an 11-minute drive from SmartCentres Mississauga for all your shopping needs. Explore the nearby West Branch Park, McNally Street Park, and Cedarvale Park, providing abundant opportunities for outdoor recreation and waterfront enjoyment.
Transportation : Take advantage of Juniper Gate's prime location with seamless access to transportation options. Georgetown GO station, GO Transit, VIA Rail, and GO bus services seamlessly connect residents to Downtown Toronto, Kitchener-Waterloo, and various destinations across the Greater Toronto Area. For motorists, Highway 401 is conveniently situated just a short distance to the south.
Education : Juniper Gate ensures access to top-tier elementary and secondary schools, catering to families with children. Additionally, its proximity to Algoma University, only an 18-minute drive away, makes it an attractive option for college students seeking off-campus accommodations. With its coveted location in Halton Hills, renowned for its exceptional livability, affordability, amenities, environment, and economy, investing in Juniper Gate proves to be a shrewd decision.
Juniper Gate FAQs: Everything You Need to Know
Q: Where is Juniper Gate?
A: Major Intersection: Hartwell Road and 10 Side Road in Halton Hills, ON.
Q: Who is the developer?
A: The Remington Group
Q: What is the project type?
A: Bungalows & Towns
Q: Reasons to Buy?
A: 9-minute drive to Georgetown GO station
Easy access to Highway 401
11-minute drive to SmartCentres Mississauga
Nearby parks are West Branch Park, McNally Street Park, and Cedarvale Park
18-minute drive to Algoma University
All models will have high ceilings and open-concept layouts
The best modern amenities and appliances
Q: Price Range?
A: Starting from TBA
Q: When's the Occupancy Date?
A: TBA
Q: What's the Deposit Structure?
A: TBA
Q: What's the Payable to?
A: TBA
02 Pricing
Juniper Gate prices & price list
| Starting price | $899,990 |
|---|
Full price list
Every available suite, price and floor.
- Prices by floor and exposure
- Parking, locker & fees
- Current incentives
Sent by a licensed advisor. Prices change between releases, so ask for the latest.
03 Deposit structure
Juniper Gate deposit structure
$25,000 WITH OFFER •$25,000 IN60 DAYS •$25,000 IN120 DAYS •$25,000 IN200 DAYS •$25,000 IN275DAYS
As published by the builder. Your agreement of purchase and sale sets the exact schedule.
04 Location & transit
Juniper Gate location & transit
05 Key dates
Juniper Gate key dates
October 8, 2026
Details last updated
Spring 2026
Estimated occupancy
06 Monthly cost
Estimate your Juniper Gate mortgage payment
Estimated monthly
$3,998
Principal and interest only. Excludes maintenance fees, property tax and insurance.
07 The builder
About The Remington Group
The Remington Group is the developer behind Juniper Gate.
More from The Remington Group
Before you sign with any builder
- Look the builder up on the HCRA Ontario Builder Directory: its licence, past homes and any conditions or convictions.
- Read the Tarion Addendum in your agreement. It sets the closing dates, how delays work and what the builder owes you if it is late.
- Know your deposit protection. Tarion covers deposits on a freehold home up to a set limit; ask how anything above it is held.
- There is no cooling-off period on a new freehold home in Ontario, so have a real estate lawyer review the agreement before you sign, or make it conditional on that review.
- Get every promise in writing: upgrades, lot premium, grading and closing adjustments.
08 New-home warranty
The Tarion warranty on a home at Juniper Gate
1 year
Workmanship and materials, plus the home must be fit to live in and meet the Ontario Building Code.
2 years
Water getting through the basement or the building envelope, electrical, plumbing and heating systems, and Building Code violations that affect health and safety.
7 years
Major structural defects.
Coverage periods are set by Ontario's new-home warranty law and apply to every new freehold home and condo suite. The builder must be licensed by the HCRA; check its record on the Ontario Builder Directory before you sign. How the Tarion warranty works
09 Assignments
Juniper Gate assignments
No Juniper Gate assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales
Own a unit here?
List your assignment free. We check the builder's consent terms and keep your details private.
Compare
Similar projects in Halton Hills
Launching soonCondo3photos
Launching soonDetached & semi
Launching soonCondo
Before you buy
The rules that protect pre-construction buyers in Ontario, in plain language.
- 01How pre-construction deposits workTypical schedules, where the money is held and Tarion deposit protection.
- 02HST rebates on new homesWho qualifies, how the rebate is assigned to the builder and what investors owe.
- 03Tarion new-home warrantyThe 1-, 2- and 7-year coverage and delayed-closing compensation.
- 04Closing costs on a new buildDevelopment charges, levies, land transfer tax and adjustments to budget for.
Questions
Juniper Gate FAQs
Quick answers about Juniper Gate. Have another question?
Where is Juniper Gate located?
In Halton Hills, Ontario. Juniper Gate is a new pre-construction houses development there.
What kind of homes does Juniper Gate offer?
Houses. Juniper Gate is a houses development in Halton Hills, Ontario; the full model and floor-plan collection is available on request.
How much does Juniper Gate cost?
From $899,990. That is the lowest home price on the latest Juniper Gate price list we hold; builders change prices between releases, so request the current price list before you decide.
When is occupancy for Juniper Gate?
Estimated for 2026. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.
Is Juniper Gate a good investment?
It depends on your budget, timeline and the Halton Hills, Ontario market. Buying pre-construction at Juniper Gate fixes today's price with a staged deposit, with occupancy expected in 2026; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.
How do I get floor plans and prices for Juniper Gate?
Request them on this page. Our team emails Juniper Gate's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.
More pre-construction questionsFewer questions
What is a pre-construction project?
A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.
How do deposits work for pre-construction?
Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.
What happens if the project is delayed?
Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.
What are the risks of buying pre-construction?
Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.
When do I start making mortgage payments?
Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.
Can I customize my unit?
Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.
What warranties are included with pre-construction homes?
New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.
What happens if the developer goes bankrupt?
If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.
What documents do I need to review before purchasing?
Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.
How long does it take from purchase to move-in?
Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.
Can I visit the construction site?
Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.
What happens at the final inspection and closing?
Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.
Get the Juniper Gate price list before you decide.
Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.
Coldwell Banker Summit Realty, BrokerageLast updated
Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.
Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.
From
$899,990




