Skip to main content
Launching soonCondos

Lilibet Condo by Intergulf Development Group

520 West 28th Avenue, Vancouver, British Columbia

PriceNot released

Occupancy
Completed Apr 2023
Suites
2-2
Artist's concept
Type
Condos
Units
59
Suites
2-2
Price from
Not released
Deposit
First deposit: 10%
Occupancy
Completed Apr 2023
Status
Coming Soon
Last updated

01 Overview

About Lilibet Condo

Lilibet Condo is a condos development by Intergulf Development Group at 520 West 28th Avenue, Vancouver with 59 suites. Prices haven't been released yet, with occupancy estimated for Completed Apr 2023. Current status: coming soon (updated September 2026).

The most anticipated preconstruction project in Vancouver

Lilibet is a new condo and townhouse development by Intergulf Development Group at 520 West 28th Avenue, Vancouver. The development was completed in 2023. Lilibet has a total of 59 units.

Read the full description

Lilibet is a return to community, family and comfort – it's a vision by a long-standing local developer who is well-versed in all three.

The collection of 59 One-Two and Three-bedroom Garden homes and Townhomes are arranged throughout eight low-density buildings.

Across the street from Queen Elizabeth Park, one block from vibrant Cambie Street, and a less than ten-minute walk to dynamic Main Street, Vancouver gems are a short bike, stroll, SkyTrain ride or drive away.

Features & Finishes Project is centrally located to amenities, nature and transportation corridors. The project is a 2-5 minute walk to Queen Elizabeth Park, Hillcrest Community Centre and King Edward Skytrain Station. Project is in close proximity to South Main shopping and dinning, Van Dusen Botanical Garden and Oakridge Shopping Centre. A 5-10 minute drive from the project is Granville Island, South Granville Shopping and Downtown Vancouver. Project features a central courtyard with a child play area, open law, garden plots, and a lounge with a fire pit. Project offers EV enabled parking stalls and bike storage., Kitchen Floor: Engineered Hardwood, Kitchen Counter: Quartz, Entry Floor: Engineered Hardwood, Living Area Floor: Engineered Hardwood, Bedroom Floor: Engineered Hardwood, Main Bathroom Floor: Porcelain, Main Bathroom Counter: Quartz, Ensuite Bathroom Floor: Porcelain, Ensuite Bathroom Counter: Quartz, Cabinets: Laminate, Appliance Finish: Stainless, Fridge: Bottom Freezer, Stove: Gas Five Plus Burner, Brands: Miele, Blomberg, Kohler, AC: Individual Source: Intergulf

Builders website:

02 Pricing

Lilibet Condo prices & price list

The builder hasn't published pricing for Lilibet Condo yet. Request the price list and we'll send it to you as soon as it's out.

Full price list

Every available suite, price and floor.

  • Prices by floor and exposure
  • Parking, locker & fees
  • Current incentives

Sent by a licensed advisor. Prices change between releases, so ask for the latest.

03 Deposit structure

Lilibet Condo deposit structure

First deposit: 10%

As published by the builder. Your agreement of purchase and sale sets the exact schedule.

04 Floor plans

Lilibet Condo floor plans

2 plans from the latest release. Prices and availability move quickly, so request any plan to get its current price.
  • Townhome B1 floor planAvailable

    Townhome B1

    2 bed · 2 bath

    $1,699,000
  • Townhome B2 floor planAvailable

    Townhome B2

    2 bed · 2 bath

    $1,779,000

05 Amenities

Lilibet Condo amenities

  • All-inclusive amenities
  • Modern appliances
  • Spacious living areas
  • Convenient location
  • High-speed internet
  • 24-hour security
  • Fitness center
  • On-site parking
  • Rooftop terrace
  • Pet-friendly

06 Location & transit

Lilibet Condo location & transit

Address

520 West 28th Avenue

Vancouver, British Columbia

07 Key dates

Lilibet Condo key dates

  1. September 30, 2026

    Details last updated

  2. Completed Apr 2023

    Estimated occupancy

08 The builder

About Intergulf Development Group

Intergulf Development Group is the developer behind Lilibet Condo.

More from Intergulf Development Group

All Intergulf Development Group projects

09 Assignments

Lilibet Condo assignments

No Lilibet Condo assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales

Own a unit here?

List your assignment free. We check the builder's consent terms and keep your details private.

List your assignment free

VIP access · before the public launch

Register before Lilibet Condo opens to the public.

Registration is free. You'll hear from a licensed advisor, not a call centre, and you're never obliged to buy.

  1. First look

    Pricing and floor plans as soon as the builder releases them to registrants.

  2. Earlier choice

    A chance at layouts, floors and exposures before the public, where the builder offers a VIP allocation.

  3. Launch incentives

    Extended deposits or capped levies where the builder offers them.

Questions

Lilibet Condo FAQs

Quick answers about Lilibet Condo. Have another question?

Where is Lilibet Condo located?

In Vancouver, British Columbia. Lilibet Condo is a new pre-construction condos development there.

What kind of homes does Lilibet Condo offer?

Condos — 59 suites. Lilibet Condo is a condos development in Vancouver, British Columbia; the full suite and floor-plan collection is available on request.

What suite sizes are available at Lilibet Condo?

2-2 suites. Floor plans with exact sizes and prices for each suite at Lilibet Condo are available on request.

When is occupancy for Lilibet Condo?

Estimated for 2023. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.

Is Lilibet Condo a good investment?

It depends on your budget, timeline and the Vancouver, British Columbia market. Buying pre-construction at Lilibet Condo fixes today's price with a staged deposit, with occupancy expected in 2023; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.

How do I get floor plans and prices for Lilibet Condo?

Request them on this page. Our team emails Lilibet Condo's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.

More pre-construction questions
What is a pre-construction project?

A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.

How do deposits work for pre-construction?

Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.

What happens if the project is delayed?

Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.

What are the risks of buying pre-construction?

Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.

When do I start making mortgage payments?

Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.

Can I customize my unit?

Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.

What warranties are included with pre-construction homes?

New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.

What happens if the developer goes bankrupt?

If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.

What documents do I need to review before purchasing?

Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.

How long does it take from purchase to move-in?

Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.

Can I visit the construction site?

Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.

What happens at the final inspection and closing?

Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.

Get the Lilibet Condo price list before you decide.

Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.

Coldwell Banker Summit Realty, BrokerageLast updated

Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.

Summitly (Coldwell Banker Summit Realty, Brokerage) is licensed in Ontario. For this British Columbia project we share published research and can put you on the builder's registration list; a brokerage licensed in British Columbia handles any purchase.

Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.

Price

Not released

Call