Skip to main content
Selling nowCondos

Shift Condos by Ironstone Building Company

236 Edgevalley Rd, London, Ontario

From$529,000

Occupancy
Construction
Suites
3-3
Artist's concept
Type
Condos
Units
66
Suites
3-3
Price from
$529,000
Occupancy
Construction
Status
Selling Now
Last updated

01 Overview

About Shift Condos

Shift Condos is a condos development by Ironstone Building Company at 236 Edgevalley Rd, London with 66 suites. Prices start from $529,000, with occupancy estimated for Construction. Current status: selling now (updated October 2026).

The most anticipated preconstruction project in London

Shift Condos is a new condo development By Ironstone Building Company currently under construction at 234 Edgevalley Road, London. Available units range in price from $529,000 to $554,000. Shift Condos has a total of 66 units. Sizes range from 1584 to 1809 square feet.

Read the full description

Shift Condos - Now Selling!

Make the shift to your new lifestyle. Located just steps from the Thames River in North London, Shift features modern stacked condominiums designed with Ironstone's distinctive California-inspired architecture. Floor plans feature open concept living spaces, upgraded finishes and more.

All conveniently located less than 10 minutes from Masonville Mall and less than 20 minutes from downtown, close to Fanshawe College and University of Western Ontario! Shift is the perfect location for nature-lovers who need easy access to city amenities.

Our exclusive Ironclad Pricing Guarantee ensures you get the best value for your new condo.

Features & Finishes Exterior Private deck as per design with contemporary glass balconies on Caymen models and pressure treated decks on most Nassau models Floor to ceiling vinyl casement windows throughout home (excluding basement sliders) enhanced by Juliette balconies Upgraded steel insulated exterior front doors with "multi-lock" security system Vinyl Clad patio doors Aluminum fascia, soffits, eaves and downspouts James Hardie Cement Fibre Siding Maintenance free living

Quality Construction Features Conventional SPF floor joists 7/16" OSB roof sheathing All exterior walls are constructed with 2" x 6" spruce studs 16" O.C. 3/4" tongue & groove engineered subfloor glued, screwed and nailed R22 insulation on exterior walls above grade and R60 fiberglass in the attic

Electrical & Mechanical Natural gas fired high efficiency forced air furnace Central air conditioning Programmable thermostat Simplified HRV system Natural gas-fired water heater (rented at purchasers' expense) 100 Amp circuit breaker electrical panel Hard-wired smoke detector on every floor (carbon monoxide detector on floors located with bedrooms) Kitchen – over the range microwave – vented directly to exterior Exhaust fans in all bathrooms 2 exterior electrical outlets (where applicable) Decora outlets and light switches throughout home

Flooring Waterproof luxury vinyl plank on main floor areas Carpeted bedrooms Engineered hardwood floor throughout the great room, and upper hallway (as per design) Ceramic tile in finished laundry & baths

Plumbing Moen single lever contemporary faucets in brushed nickel as per predesignated interior colour package Undermount double stainless steel sink in kitchen All plumbing fixtures including tubs, toilets, sinks are white 3/4 pc. Acrylic tub and shower in main bath (tub & shower if applicable) Posi-temp shower valves in all bathrooms Fully tiled shower or 3/4 acrylic shower in each ensuite Waterline rough in for fridge Sump pump in lower end units only Shut off valves for plumbing fixtures in kitchen and bathrooms

Interior Finishes 9' Ceiling on main floors Floor to ceiling windows (except basements) Hard surface kitchen counter tops Luxury vinyl plank flooring on main floor Under cabinet lighting in kitchen Oversized luxury ensuite shower with glass doors Laminate counter tops in bathrooms Wire shelving in all closets Lighting plan includes pot lights and fixtures as viewed in the model Framed mirrors over all vanities Contemporary brushed nickel hardware for interior doors as per predesignated interior colour package Premium interior doors Paint grade contemporary casing and baseboard "Knockdown" textured ceilings throughout except bath, laundry & closet areas

Source: Ironstone Condos

Builders website:

02 Pricing

Shift Condos prices & price list

Shift Condos pricing
Starting price$529,000
Up to$554,000

Full price list

Every available suite, price and floor.

  • Prices by floor and exposure
  • Parking, locker & fees
  • Current incentives

Sent by a licensed advisor. Prices change between releases, so ask for the latest.

03 Floor plans

Shift Condos floor plans

9 plans from the latest release. Prices and availability move quickly, so request any plan to get its current price.
  • 85 floor planAvailable

    85

    3 bed · 2 bath

    $529,000
  • 87 floor planAvailable

    87

    3 bed · 2 bath

    $549,000
  • 91 floor planAvailable

    91

    3 bed · 2 bath

    $549,000
  • 97 floor planAvailable

    97

    3 bed · 2 bath

    $554,000
  • The Nassau Enhanced Unit floor planAvailable

    The Nassau Enhanced Unit

    3 bed · 2 bath

    Price on request
  • The Nassau End Unit floor planAvailable

    The Nassau End Unit

    3 bed · 2 bath

    Price on request

04 Amenities

Shift Condos amenities

  • Effortless access to major highway
  • Close proximity to amenities such as parks, schools, restaurants, and shopping
  • Convenient location with numerous options for shopping and entertainment
  • Additional benefit of easy access to other facilities such as healthcare centers, public transport, etc.

05 Location & transit

Shift Condos location & transit

Address

236 Edgevalley Rd

London, Ontario

06 Key dates

Shift Condos key dates

  1. October 11, 2026

    Details last updated

  2. Construction

    Estimated occupancy

07 Monthly cost

Estimate your Shift Condos mortgage payment

$530,000
20% · $106,000
4.49%
25 years

Estimated monthly

$2,354

Principal and interest only. Excludes maintenance fees, property tax and insurance.

08 The builder

About Ironstone Building Company

09 Assignments

Shift Condos assignments

No Shift Condos assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales

Own a unit here?

List your assignment free. We check the builder's consent terms and keep your details private.

List your assignment free

Compare

Similar projects in London

All new homes in London
  • Sterling at Silverleaf, London by Birchwood HomesSelling nowDetached & semi5photos

    Sterling at Silverleaf

    by Birchwood Homes · London

    From $879,900

    Occupancy
    Construction
  • RiverBend Golf Community, London by Sifton Properties LimitedSelling nowDetached & semi6photos

    RiverBend Golf Community

    by Sifton Properties Limited · London

    From $731,000

    Beds
    1–2 bd
    Occupancy
    Construction

Before you buy

The rules that protect pre-construction buyers in Ontario, in plain language.

  1. 01How pre-construction deposits workTypical schedules, where the money is held and Tarion deposit protection.
  2. 02HST rebates on new homesWho qualifies, how the rebate is assigned to the builder and what investors owe.
  3. 03The 10-day condo cooling-off periodYour right to cancel a new condo purchase, and when the clock starts.
  4. 04Tarion new-home warrantyThe 1-, 2- and 7-year coverage and delayed-closing compensation.
  5. 05Closing costs on a new buildDevelopment charges, levies, land transfer tax and adjustments to budget for.

Questions

Shift Condos FAQs

Quick answers about Shift Condos. Have another question?

Where is Shift Condos located?

In London, Ontario. Shift Condos is a new pre-construction condos development there.

What kind of homes does Shift Condos offer?

Condos — 66 suites. Shift Condos is a condos development in London, Ontario; the full suite and floor-plan collection is available on request.

How much does Shift Condos cost?

From $529,000. That is the lowest suite price on the latest Shift Condos price list we hold; builders change prices between releases, so request the current price list before you decide.

What suite sizes are available at Shift Condos?

3-3 suites. Floor plans with exact sizes and prices for each suite at Shift Condos are available on request.

When is occupancy for Shift Condos?

Estimated for Construction. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.

Is Shift Condos a good investment?

It depends on your budget, timeline and the London, Ontario market. Buying pre-construction at Shift Condos fixes today's price with a staged deposit, with occupancy expected in Construction; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.

How do I get floor plans and prices for Shift Condos?

Request them on this page. Our team emails Shift Condos's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.

More pre-construction questions
What is a pre-construction project?

A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.

How do deposits work for pre-construction?

Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.

What happens if the project is delayed?

Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.

What are the risks of buying pre-construction?

Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.

When do I start making mortgage payments?

Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.

Can I customize my unit?

Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.

What warranties are included with pre-construction homes?

New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.

What happens if the developer goes bankrupt?

If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.

What documents do I need to review before purchasing?

Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.

How long does it take from purchase to move-in?

Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.

Can I visit the construction site?

Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.

What happens at the final inspection and closing?

Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.

Get the Shift Condos price list before you decide.

Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.

Coldwell Banker Summit Realty, BrokerageLast updated

Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.

Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.

From

$529,000

Call