Skip to main content
Selling nowHouses

Central District Towns by Icon Homes and Old Orchard Development

770 Kingston Road, Pickering, Ontario

From$759,900

Occupancy
Est. 2024
Deposit
15%
Homes
2-2
Artist's concept
Type
Houses
Units
88
Homes
2-2
Price from
$759,900
Deposit
15% in 2 payments
Occupancy
Est. 2024
Status
Selling Now
Last updated

01 Overview

About Central District Towns

Central District Towns is a houses development by Icon Homes and Old Orchard Development at 770 Kingston Road, Pickering with 88 homes. Prices start from $759,900, with occupancy estimated for Est. 2024. Current status: selling now (updated September 2026).

The most anticipated preconstruction project in Pickering

Central District Towns is a new townhouse development by Icon Homes and Old Orchard Development currently in preconstruction at 770 Kingston Road, Pickering. The development is scheduled for completion in 2024. Available units range in price from $759,900 to $779,900. Central District Towns has a total of 88 units. Sizes range from 1028 to 1050 square feet.

Read the full description

LIVE IN THE CENTRE OF IT ALL

Imagine living in a location so inspired, every comfort you desire is just outside your door. Central District Towns puts you on the cusp of Pickering's revitalized and burgeoning downtown, minutes from beautiful waterfront vistas, and right near Rouge National Park, one of Southern Ontario's finest protected parklands. Only 88 homeowners and families will be fortunate enough to call this place home. Move to the centre of it all, with Central District Towns.

Features & Finishes TOWNHOME FEATURES Spectacular architecturally controlled façade with modern exterior features. High quality Thermopane casement windows with Low-E glass and argon gas filled, for energy savings. High quality Thermopane glass sliding patio doors to balconies (as per plan). Superior, insulated front entry door with brushed nickel hardware and house numbers. Ceiling heights of approximately 9' on the main floor and approximately 8' on lower or upper floors. Excluding vaulted ceilings, bulkheads or structural mechanical components. Smooth ceilings in kitchens and bathrooms. Architectural textured ceilings with 4? smooth borders throughout. Contemporary doors, baseboards and window trim throughout. Stacked laundry centre including applicable electrical outlet and rough-in venting to the exterior (as per plan). Natural oak handrail and pickets. Paint grade stringers with carpet treads. Closet shelving (as per plan).

KITCHENS Choice of designer cabinetry in a variety of finishes from vendor standard selections. Choice of laminate countertops from vendor standard selections. Stainless steel sink with single lever faucet. Rough-in and cabinet for dishwasher. All appliance areas provided with applicable electrical and plumbing rough-in.

BATHROOMS Choice of designer cabinetry in a variety of finishes from vendor standard selections. Choice of laminate countertops from vendor standard selections. Choice of sleek imported ceramic wall tiles from vendor standard selections. Powder rooms featuring contemporary pedestal sink (as per plan). Polished chrome, designer selected, single lever faucets. High efficiency water-saving fixtures throughout all bathrooms. Water temperature balanced sensor in shower and tub to ensure comfort. Mirror above vanity or pedestal sink in all bathrooms. Master ensuite bathroom with stand up shower to receive a framed glass door (as per plan).

FLOORING FEATURES Choice of imported porcelain or ceramic tile in foyer, powder room, laundry room, bathrooms and mechanical rooms from vendor standard selections. Choice of laminate flooring from our designer standard samples in kitchen, living room, dining room and associated hallways (as per plan). High quality berber looped carpet in all bedrooms, associated hallways and stairs from vendor designer selected samples (as per plan).

ELECTRICAL AND MECHANICAL FEATURES 100 amp electrical service with accessible breaker panel. Ceiling light fixtures provided in all bedrooms, kitchen, stairways, and hallways as per plan (location to be determined by vendor). White decora plugs and switches throughout. Programmable thermostat. Dedicated Cat 5 data outlet rough-in only provided in location chosen by the vendor. Exhaust fan in laundry room for ventilation. Counter level receptacles in kitchen for ease of use. Ground fault protected electrical outlets in all bedrooms. Electronic door chimes. Interconnected smoke detectors and carbon monoxide detectors hard wired into the electrical system on all levels. Superior mechanical system designed to capture energy savings. High Velocity air handler with combination boiler unit domestic hot water tank for superior efficiency.

ICARE FEATURES High performance engineered floor assembly designed for superior construction. 2' x 6' wall construction with continuous insulation for exterior sheathing. Shut off valves on all hot and cold water lines for all sinks and toilets to maximize water efficiency. Tub and shower installed with water and moisture resistant board enclosures up to ceiling.

ICON Homes Warranty is backed by Tarion's Ontario New Home Warranty Program

Watch the video below and know more about Central District Towns!

Source: Central District Towns

Builder's website - and

02 Pricing

Central District Towns prices & price list

Central District Towns pricing
Starting price$759,900
Up to$779,900

Full price list

Every available suite, price and floor.

  • Prices by floor and exposure
  • Parking, locker & fees
  • Current incentives

Sent by a licensed advisor. Prices change between releases, so ask for the latest.

03 Deposit structure

Central District Towns deposit structure

Total deposit before occupancy

15%

  1. 5% · 000 on signing Balance to in 30 days 2.5% in 90 days 2.5% in 180 days 2.5% in 270 days 2.5% in 365 days 5% on Occupancy Non-resident Deposit Structure*
  2. 10% · 000 on Signing Balance to in 30 Days 10% in 90 Days 10% in 180 Days 5% in 270 Days
Central District Towns deposit schedule
PaymentWhen%On $759,900
Deposit 1000 on signing Balance to in 30 days 2.5% in 90 days 2.5% in 180 days 2.5% in 270 days 2.5% in 365 days 5% on Occupancy Non-resident Deposit Structure*5%$37,995
Deposit 2000 on Signing Balance to in 30 Days 10% in 90 Days 10% in 180 Days 5% in 270 Days10%$75,990
Total15%$113,985

For illustration: the builder's published deposit structure, applied to the starting price. Your agreement of purchase and sale sets the exact amounts and dates. How deposits work

04 Floor plans

Central District Towns home models & floor plans

4 models from the latest release. Prices and availability move quickly, so request any plan to get its current price.
  • 2 Bed floor planAvailable

    2 Bed

    2 bed · bath

    Price on request
  • 2 Bed floor planAvailable

    2 Bed

    2 bed · bath

    Price on request
  • 2 Bed floor planAvailable

    2 Bed

    2 bed · bath

    Price on request
  • 2 Bed floor planAvailable

    2 Bed

    2 bed · bath

    Price on request

05 Amenities

Central District Towns amenities

  • Parkette
  • Easy access to major highways,
  • Nearby Schools,
  • Restaurants,
  • Shopping and many more.

06 Location & transit

Central District Towns location & transit

Address

770 Kingston Road

Pickering, Ontario

07 Key dates

Central District Towns key dates

  1. September 30, 2026

    Details last updated

  2. Est. 2024

    Estimated occupancy

08 Monthly cost

Estimate your Central District Towns mortgage payment

$760,000
20% · $152,000
4.49%
25 years

Estimated monthly

$3,376

Principal and interest only. Excludes maintenance fees, property tax and insurance.

09 The builder

About Icon Homes and Old Orchard Development

Icon Homes and Old Orchard Development is the developer behind Central District Towns.

All Icon Homes and Old Orchard Development projects

Before you sign with any builder

  • Look the builder up on the HCRA Ontario Builder Directory: its licence, past homes and any conditions or convictions.
  • Read the Tarion Addendum in your agreement. It sets the closing dates, how delays work and what the builder owes you if it is late.
  • Know your deposit protection. Tarion covers deposits on a freehold home up to a set limit; ask how anything above it is held.
  • There is no cooling-off period on a new freehold home in Ontario, so have a real estate lawyer review the agreement before you sign, or make it conditional on that review.
  • Get every promise in writing: upgrades, lot premium, grading and closing adjustments.

10 New-home warranty

The Tarion warranty on a home at Central District Towns

  • 1 year

    Workmanship and materials, plus the home must be fit to live in and meet the Ontario Building Code.

  • 2 years

    Water getting through the basement or the building envelope, electrical, plumbing and heating systems, and Building Code violations that affect health and safety.

  • 7 years

    Major structural defects.

Coverage periods are set by Ontario's new-home warranty law and apply to every new freehold home and condo suite. The builder must be licensed by the HCRA; check its record on the Ontario Builder Directory before you sign. How the Tarion warranty works

11 Assignments

Central District Towns assignments

No Central District Towns assignments are listed right now. Buying an assignment means taking over a buyer's contract before closing, often at a price set when the project launched. Browse assignment sales

Own a unit here?

List your assignment free. We check the builder's consent terms and keep your details private.

List your assignment free

Compare

Similar projects in Pickering

All new homes in Pickering
  • Seaton Whitevale Phase 6, Pickering by Mattamy Homes CanadaSelling nowTownhome7photos

    Seaton Whitevale Phase 6

    by Mattamy Homes Canada · Pickering

    From $807,990

    Beds
    3 bd
    Occupancy
    2026
  • The Highmark Condos, Pickering by Highmark HomesSelling nowCondo4photos

    The Highmark Condos

    by Highmark Homes · Pickering

    From $500,000

  • Seatonville by DECO Homes, Pickering by DECO Homes
    Selling nowTownhome

    Seatonville by DECO Homes

    by DECO Homes · Pickering

    From $879,990

Before you buy

The rules that protect pre-construction buyers in Ontario, in plain language.

  1. 01How pre-construction deposits workTypical schedules, where the money is held and Tarion deposit protection.
  2. 02HST rebates on new homesWho qualifies, how the rebate is assigned to the builder and what investors owe.
  3. 03Tarion new-home warrantyThe 1-, 2- and 7-year coverage and delayed-closing compensation.
  4. 04Closing costs on a new buildDevelopment charges, levies, land transfer tax and adjustments to budget for.

Questions

Central District Towns FAQs

Quick answers about Central District Towns. Have another question?

Where is Central District Towns located?

In Pickering, Ontario. Central District Towns is a new pre-construction houses development there.

What kind of homes does Central District Towns offer?

Houses — 88 homes. Central District Towns is a houses development in Pickering, Ontario; the full model and floor-plan collection is available on request.

How much does Central District Towns cost?

From $759,900. That is the lowest home price on the latest Central District Towns price list we hold; builders change prices between releases, so request the current price list before you decide.

What home sizes are available at Central District Towns?

2-2 homes. Floor plans with exact sizes and prices for each home at Central District Towns are available on request.

When is occupancy for Central District Towns?

Estimated for 2024. Occupancy dates on pre-construction are set by the builder and can move as construction progresses; your purchase agreement lists the firm and outside dates.

Is Central District Towns a good investment?

It depends on your budget, timeline and the Pickering, Ontario market. Buying pre-construction at Central District Towns fixes today's price with a staged deposit, with occupancy expected in 2024; compare it with nearby projects and resale before you commit, and ask our team or Zara for a project-specific assessment.

How do I get floor plans and prices for Central District Towns?

Request them on this page. Our team emails Central District Towns's floor plans, price list and current incentives, plus Platinum priority access where the builder offers it, at no cost to you.

More pre-construction questions
What is a pre-construction project?

A pre-construction project is a new residential development that is sold before construction is completed. Buyers purchase units during the planning or early construction phase, often at lower prices than completed units. You'll receive a unit upon project completion, typically 1-3 years after purchase.

How do deposits work for pre-construction?

Deposits for pre-construction projects are typically structured in stages. You'll usually pay 5-10% on signing, followed by additional deposits at specific milestones (e.g., 5% at occupancy permit, 5% at closing). These deposits are held in trust by the developer's lawyer until closing.

What happens if the project is delayed?

Construction delays are common in pre-construction projects. Your purchase agreement will include an 'outside closing date' that allows for reasonable delays. If delays exceed the specified timeframe, you may have options to cancel and receive your deposits back, depending on your contract terms.

What are the risks of buying pre-construction?

Key risks include construction delays, potential changes to the final product, market value fluctuations, and developer bankruptcy. However, you also benefit from lower initial pricing, potential appreciation, and the ability to secure a brand-new home. Always work with reputable developers and review all contracts carefully.

When do I start making mortgage payments?

Mortgage payments begin only after you take possession of your completed unit, typically at the final closing date. During construction, you'll only make staged deposits. You'll need mortgage pre-approval closer to completion, usually 90-120 days before the expected closing date.

Can I customize my unit?

Customization options vary by developer and project phase. Early buyers often have more choices in finishes, fixtures, and layouts. Common customizable elements include flooring, kitchen cabinets, countertops, and bathroom fixtures. Options are typically presented during the design center appointment, which occurs after purchase.

What warranties are included with pre-construction homes?

New homes in Canada come with provincial new-home warranty protection — Tarion/HCRA in Ontario and equivalent programs in other provinces. This typically includes one-year coverage for defects, two-year coverage for water penetration, and seven-year coverage for major structural defects. Your developer will provide warranty details at closing.

What happens if the developer goes bankrupt?

If a developer declares bankruptcy, your deposits are typically protected if they were held in trust. However, the project may be delayed or cancelled. In some cases, another developer may take over the project. It's crucial to research developers' financial stability and track record before purchasing.

What documents do I need to review before purchasing?

Essential documents include the purchase agreement, disclosure statement, architectural plans, condo declaration (for condos), and developer's financial statements. Have a real estate lawyer review all documents before signing. Pay special attention to deposit structure, completion dates, and cancellation rights.

How long does it take from purchase to move-in?

Timeline varies by project, typically ranging from 12-36 months. Factors include project size, construction complexity, and market conditions. Your purchase agreement will include an estimated occupancy date, but this is subject to change. Stay in regular communication with your developer for updates.

Can I visit the construction site?

Site visits are usually allowed but must be scheduled with the developer for safety and insurance reasons. Many developers offer periodic site tours or provide progress updates through photos and videos. Always follow safety protocols and never visit the site without authorization.

What happens at the final inspection and closing?

Before closing, you'll conduct a pre-delivery inspection (PDI) to identify any defects or issues. These are documented and should be addressed by the developer. At closing, you'll pay the final balance, receive keys, and complete final paperwork. Your lawyer will handle the closing process and ensure all conditions are met.

Get the Central District Towns price list before you decide.

Current prices, available floor plans and incentives, sent to you by a licensed advisor. Free, no obligation.

Coldwell Banker Summit Realty, BrokerageLast updated

Summitly is a brokerage, not the builder; prices, incentives and availability are set by the builder and can change.

Sizes, specifications and dates are preliminary and provided for information only. Renderings and floor plans are artist's concepts. This is not an offering for sale; an offering can only be made with the applicable disclosure statement. Verify all details with the builder. Marketed by Coldwell Banker Summit Realty, Brokerage. E. & O.E.

From

$759,900

Call